|
The Carriage House
Before
This will be a major renovation as the Carriage House is in dire need of a proper foundation (it's on mudsill), roof (has original shake roof), paint (paint, what paint?), and general maintenance. We won't get to this project until 2005-6 unless we can find a grant that saves old Carriage houses. Let us know if you have any leads, Thanks!
Left: Here's where the hay was hoisted and stored. Right: stairway to second floor.
Upstairs has two rooms; here's the room on the left.
Here's the upstairs room on the right.
Left: Downstairs has two rooms and something loosely resembling a kitchen.
|